All our in-ground fibreglass pools can be installed indoors.
We’re always happy to talk to potential customers’ architects, designers, building contractors, M&E Consultants, structural engineers or anyone else involved in the design and build process.

The installation process: lay the foundations and then excavate the pool hole before installing the pool, filling it with water and backfilling with sand and cement. The pool can then be left full whilst building works are undertaken. Your building contractor will usually decide to cover the pool with a deck for safety and protection.

Latest updates to building regulations now require all indoor pool shells to be insulated to a very high level. This can be achieved by insulating the base and walls with specialist insulation – please see the pool insulation page for more details. Sundance Pools can also provide information on and have a range of air-handling solutions paired with automated covers and heat retention blankets.